Our Gencor
300 Portable Ultra Modern Asphalt Pre-Mix Plant is located at
13790 - 256th Street in Maple Ridge B.C. 
This plant is capable
of
producing over 300 tonnes of asphalt pre-mix per hour of various
job specific requirements including
conventional paving products meeting all Master Municipal Specifications.
This is the same make and model as our Asphalt
Drum Plant located in Delta on the banks of the Fraser River.
Gencor's
Ultraplant is a fuel efficient, environmentally clean Asphalt Manufacturing
Plant. Vapors generated in the mixing section are pulled through
the burner by a patented volatile reclaim system and consumed as
fuel. There are no odors or blue smoke emissions to pollute the
environment. Air monitoring and emission monitoring is performed
by McCall
Environmental to ensure our high quality standards are achieved.
|